Clear Requirements
Documents and technical scope are mapped from the beginning.
IRK (City Planning Information) and KRK (City Planning Certificate) are official documents that provide fundamental information regarding spatial planning regulations for a specific location, including land use designation, building intensity parameters, and technical requirements for land and space utilization.
Documents and technical scope are mapped from the beginning.
Each stage is handled with structured coordination and reporting.
The work is aligned with relevant technical and administrative standards.
Service Overview
City Planning Information (IRK) and City Planning Certificate (KRK) are official documents that provide information regarding the spatial planning regulations applicable to a specific location in accordance with local government policies. These documents outline land use designation, development intensity parameters, building setback requirements, permissible building heights, and other technical provisions that serve as the basis for planning and developing buildings or areas. IRK and KRK play a vital role in ensuring that proposed developments comply with applicable spatial planning regulations, thereby supporting a smooth, lawful, orderly, and sustainable permitting and construction process.
The validity period of IRK and KRK refers to the timeframe during which the spatial planning information remains valid and may be used as a reference for project planning and permit applications. During this period, the documents serve as the basis for assessing compliance with land-use and spatial planning regulations established by the relevant local authorities.
The primary benefit and importance of IRK and KRK lie in their function as key references for ensuring that development plans comply with applicable spatial planning regulations. These documents provide legal certainty regarding land utilization, building intensity, and other technical requirements, helping applicants avoid zoning violations and reducing the risk of permit rejection. As such, they are essential tools for effective project planning and regulatory compliance.
The processing time for obtaining IRK and KRK generally depends on the completeness of the submitted documents and the verification process carried out by the relevant authorities. When all requirements have been fulfilled, the administrative review and spatial planning compliance assessment can typically be completed within a relatively short timeframe, in accordance with the service standards of each local government.
Work Flow
Conduct verification of the required documents to ensure completeness and consistency of data in the City Planning Information (IRK) / City Planning Certificate (KRK) application process
Prepare and submit the application for City Planning Information (IRK) / City Planning Certificate (KRK), along with all required supporting documents in accordance with applicable regulations and requirements
Conduct administrative verification by the relevant government agency to ensure the completeness and compliance of the submitted application documents with the applicable requirements
Conduct spatial planning compliance analysis to ensure that the proposed land use and development plan align with designated land use zoning and applicable spatial planning regulations
The City Planning Information (IRK) / City Planning Certificate (KRK) is issued after all verification, evaluation, and spatial planning analysis processes have been completed and confirmed to comply with applicable regulations
Requirements
Entrust your project's technical and structural requirements to our experts, delivering reliable solutions and measurable outcomes every step of the way.